Provided Electrical Engineering Design services for the replacement of the emergency electrical distribution system at the East Campus of the Central Alabama Veterans Health Care System in Tuskegee, Alabama. Project included the installation of two new 400kW diesel generators paralleled together and mounted in exterior sound attenuated enclosures, associated 1600A distribution switchgear, numerous replacement automatic transfer switches, the replacement of all 277/480V and 120/208V emergency feeder and branch circuit panelboards in buildings 2, 3, 3A, 4, 4A and 83. Estimated total construction cost: $2,000,000.00.